Materials Map

Discover the materials research landscape. Find experts, partners, networks.

  • About
  • Privacy Policy
  • Legal Notice
  • Contact

The Materials Map is an open tool for improving networking and interdisciplinary exchange within materials research. It enables cross-database search for cooperation and network partners and discovering of the research landscape.

The dashboard provides detailed information about the selected scientist, e.g. publications. The dashboard can be filtered and shows the relationship to co-authors in different diagrams. In addition, a link is provided to find contact information.

×

Materials Map under construction

The Materials Map is still under development. In its current state, it is only based on one single data source and, thus, incomplete and contains duplicates. We are working on incorporating new open data sources like ORCID to improve the quality and the timeliness of our data. We will update Materials Map as soon as possible and kindly ask for your patience.

To Graph

1.080 Topics available

To Map

977 Locations available

693.932 PEOPLE
693.932 People People

693.932 People

Show results for 693.932 people that are selected by your search filters.

←

Page 1 of 27758

→
←

Page 1 of 0

→
PeopleLocationsStatistics
Naji, M.
  • 2
  • 13
  • 3
  • 2025
Motta, Antonella
  • 8
  • 52
  • 159
  • 2025
Aletan, Dirar
  • 1
  • 1
  • 0
  • 2025
Mohamed, Tarek
  • 1
  • 7
  • 2
  • 2025
Ertürk, Emre
  • 2
  • 3
  • 0
  • 2025
Taccardi, Nicola
  • 9
  • 81
  • 75
  • 2025
Kononenko, Denys
  • 1
  • 8
  • 2
  • 2025
Petrov, R. H.Madrid
  • 46
  • 125
  • 1k
  • 2025
Alshaaer, MazenBrussels
  • 17
  • 31
  • 172
  • 2025
Bih, L.
  • 15
  • 44
  • 145
  • 2025
Casati, R.
  • 31
  • 86
  • 661
  • 2025
Muller, Hermance
  • 1
  • 11
  • 0
  • 2025
Kočí, JanPrague
  • 28
  • 34
  • 209
  • 2025
Šuljagić, Marija
  • 10
  • 33
  • 43
  • 2025
Kalteremidou, Kalliopi-ArtemiBrussels
  • 14
  • 22
  • 158
  • 2025
Azam, Siraj
  • 1
  • 3
  • 2
  • 2025
Ospanova, Alyiya
  • 1
  • 6
  • 0
  • 2025
Blanpain, Bart
  • 568
  • 653
  • 13k
  • 2025
Ali, M. A.
  • 7
  • 75
  • 187
  • 2025
Popa, V.
  • 5
  • 12
  • 45
  • 2025
Rančić, M.
  • 2
  • 13
  • 0
  • 2025
Ollier, Nadège
  • 28
  • 75
  • 239
  • 2025
Azevedo, Nuno Monteiro
  • 4
  • 8
  • 25
  • 2025
Landes, Michael
  • 1
  • 9
  • 2
  • 2025
Rignanese, Gian-Marco
  • 15
  • 98
  • 805
  • 2025

Gulina, Olga

  • Google
  • 3
  • 4
  • 2

in Cooperation with on an Cooperation-Score of 37%

Topics

Publications (3/3 displayed)

  • 2021Influence of operating time on the corrosion in single-phase and two-phase media1citations
  • 2020Repeated measurements and quality of estimates in the analysis of NPP pipeline erosion-corrosion wear1citations
  • 2018Flow-accelerated corrosion rate and residual life time estimation for the components of pipeline systems at nuclear power plants based on control datacitations

Places of action

Chart of shared publication
Salnikov, Nikolay
2 / 2 shared
Baranenko, Valery
3 / 3 shared
Mironov, Sergey
1 / 7 shared
Salnikov, Nikolaj
1 / 1 shared
Chart of publication period
2021
2020
2018

Co-Authors (by relevance)

  • Salnikov, Nikolay
  • Baranenko, Valery
  • Mironov, Sergey
  • Salnikov, Nikolaj
OrganizationsLocationPeople

article

Repeated measurements and quality of estimates in the analysis of NPP pipeline erosion-corrosion wear

  • Salnikov, Nikolay
  • Mironov, Sergey
  • Gulina, Olga
  • Baranenko, Valery
Abstract

The article presents a study carried out on carbon steel pipe components subjected to erosion-corrosion wear (ECW). Based on the repeated control data, the authors present the calculated ECW characteristics, i.e., the wall-thinning and rate. It is shown that such estimates contain great uncertainty due to corrosion products deposited on the pipeline inner surface and their migration during operation. In addition, with an increase in the operating time, for example, when the lifetime is extended, the difference between the forecast and the results of control becomes larger. This means that the error in the estimates of the residual lifetime also increases. The study is based on the data of wall thickness measurements of the feedwater pipeline (273×16 mm) and steam pipeline (465×16mm) of nuclear power plants with the VVER-440 reactors, for which a sufficient number of repeated measurements were performed over a large time interval. An analysis is made of the error in estimating the pipeline wall-thinning and ECW rate using Chexal-Horowitz Flow-Accelerated Corrosion (FAC) Model (EKI-02 and EKI-03 software tools). The estimate of the ECW rate according to the above forecast model differs from the estimate according to the current control data by no more than 12.5%, since the corrosion products deposited on the pipeline inner surface wall are leveled at a large time base. When calculating the wall-thinning, due to the obvious filtering of the control data, it is possible to achieve an acceptable accuracy of estimates, i.e., about 16% without upgrading the model.

Topics
  • impedance spectroscopy
  • surface
  • Carbon
  • steel
  • erosion-corrosion