People | Locations | Statistics |
---|---|---|
Naji, M. |
| |
Motta, Antonella |
| |
Aletan, Dirar |
| |
Mohamed, Tarek |
| |
Ertürk, Emre |
| |
Taccardi, Nicola |
| |
Kononenko, Denys |
| |
Petrov, R. H. | Madrid |
|
Alshaaer, Mazen | Brussels |
|
Bih, L. |
| |
Casati, R. |
| |
Muller, Hermance |
| |
Kočí, Jan | Prague |
|
Šuljagić, Marija |
| |
Kalteremidou, Kalliopi-Artemi | Brussels |
|
Azam, Siraj |
| |
Ospanova, Alyiya |
| |
Blanpain, Bart |
| |
Ali, M. A. |
| |
Popa, V. |
| |
Rančić, M. |
| |
Ollier, Nadège |
| |
Azevedo, Nuno Monteiro |
| |
Landes, Michael |
| |
Rignanese, Gian-Marco |
|
Nóvoa, X. Ramón
Universidade de Vigo
in Cooperation with on an Cooperation-Score of 37%
Topics
Publications (4/4 displayed)
- 2022Synergistic Interaction of Clusters of Iron Oxide Nanoparticles and Reduced Graphene Oxide for High Supercapacitor Performancecitations
- 2022Two and four–electrode configurations for contactless reinforced concrete corrosion monitoringcitations
- 2021Corrosion inhibition of iron in chloride media by the aqueous extract of Curcuma longa rhizome powdercitations
- 2019Enhanced Corrosion Resistance of Recycled Aluminum Alloy 6061 Chips Using Hot Extrusion Followed by ECAPcitations
Places of action
Organizations | Location | People |
---|
article
Two and four–electrode configurations for contactless reinforced concrete corrosion monitoring
Abstract
<jats:p>The paper addresses the need for a fast and reliable method for field monitoring reinforced concrete structures. A proof of concept is presented where a non-contact procedure provides quantitative information on the concrete resistivity and reinforcement corrosion rate. A Wenner-type probe is presented, where a combination of two and four-electrode measurements in a relatively high-frequency domain allows obtaining the information of interest. The method is based on the fact, verified by numerical simulations, that the embedded rebar works as an effective floating counter electrode and thus, for distances higher than a critical value (1 cm in the simulations done), the ratio of concrete resistivity to the measured impedance at 1 kHz is constant and only dependent on the electrode diameter. The apparent polarization resistance measured with the four-electrode arrangement and normalized to the concrete resistivity allows obtaining the actual polarization resistance without contacting the rebar whose distance to the electrodes shall be known.</jats:p>