People | Locations | Statistics |
---|---|---|
Naji, M. |
| |
Motta, Antonella |
| |
Aletan, Dirar |
| |
Mohamed, Tarek |
| |
Ertürk, Emre |
| |
Taccardi, Nicola |
| |
Kononenko, Denys |
| |
Petrov, R. H. | Madrid |
|
Alshaaer, Mazen | Brussels |
|
Bih, L. |
| |
Casati, R. |
| |
Muller, Hermance |
| |
Kočí, Jan | Prague |
|
Šuljagić, Marija |
| |
Kalteremidou, Kalliopi-Artemi | Brussels |
|
Azam, Siraj |
| |
Ospanova, Alyiya |
| |
Blanpain, Bart |
| |
Ali, M. A. |
| |
Popa, V. |
| |
Rančić, M. |
| |
Ollier, Nadège |
| |
Azevedo, Nuno Monteiro |
| |
Landes, Michael |
| |
Rignanese, Gian-Marco |
|
Jensen, Pernille Erland
in Cooperation with on an Cooperation-Score of 37%
Topics
Publications (15/15 displayed)
- 2024Oxidation of sulfides from secondary materials in cementitious binders as a function of environmental conditions
- 2024Electrodialytic extraction of copper, lead and zinc from sulfide mine tailings:Optimization of current density and operation time
- 2021Screening for key material parameters affecting early-age and mechanical properties of blended cementitious binders with mine tailingscitations
- 2019Evaluation of mine tailings’ potential as supplementary cementitious materials based on chemical, mineralogical and physical characteristicscitations
- 2017The influence of sediment properties and experimental variables on the efficiency of electrodialytic removal of metals from sedimentcitations
- 2016Degradation of oil products in a soil from a Russian Barents hot-spot during electrodialytic remediationcitations
- 2016Wood ash used as partly sand and/or cement replacement in mortarcitations
- 2016Replacement of 5% of OPC by fly ash and APC residues from MSWI with electrodialytic pre-treatment
- 2015Comparison of 2-compartment, 3-compartment and stack designs for electrodialytic removal of heavy metals from harbour sedimentscitations
- 2015Screening of variable importance for optimizing electrodialytic remediation of heavy metals from polluted harbour sedimentscitations
- 2015Multivariate methods for evaluating the efficiency of electrodialytic removal of heavy metals from polluted harbour sedimentscitations
- 2014Electrodialytically treated MSWI APC residue as substitute for cement in mortar
- 2013Effect of pulse current on acidification and removal of Cu, Cd, and As during suspended electrodialytic soil remediationcitations
- 2012Electrodialytic remediation of suspended soil – Comparison of two different soil fractionscitations
- 2007Electrodialytic extraction of Cd and Cu from sediment from Sisimiut Harbour, Greenlandcitations
Places of action
Organizations | Location | People |
---|
article
Evaluation of mine tailings’ potential as supplementary cementitious materials based on chemical, mineralogical and physical characteristics
Abstract
In order to reduce emissions of CO<sub>2</sub> from cement production and avoid severe environmental pollution from the deposition of mine waste, this study investigated the possibility of utilizing mine tailings as supplementary cementitious materials (SCM) for partially replacement of cement in concrete. This study provides a characterization study of mine tailings to evaluate their potential for contributing chemically or physically as SCM. 13 mine tailing samples were characterized in regards to chemical composition (XRF, Loss on Ignition, CaCO<sub>3</sub> and pH), mineralogical content (XRD) and physicalcharacteristics (Grain size distribution, Specific Surface Area, SEM-analysis). The characterization study showed five mine tailings to possess potential chemical contribution as SCM based on their chemical composition (SiO<sub>2</sub>, Al<sub>2</sub>O<sub>3</sub>, Fe<sub>2</sub>O<sub>3</sub> and CaO) and amorphous content. Three mine tailings showed potential physicalcontribution as SCM based on grain size and grain morphology. The remainder mine tailing characteristics suggest that their potential as SCM may be improved by pretreatment such as milling and/or thermal treatment.